NATIONWIDE DESIGN CAPABILITES

JMP has successfully undertaken major transport and infrastructure projects for public and private sectors throughout Australia. We can handle complex road, rail, airport and freight terminal engineering projects – delivering on time and on budget. Our award-winning team design and engineer for future growth and long term efficiency, along with safer working conditions. Examples of our projects include docks, wharves and terminals, distribution centres and new design techniques for heavy duty road construction.

Value adding…
Heavy duty pavements designed to reutilise existing
sub-base materials from the site at the Coode Island Road
Diversion Works.

Cost savings…
By using state of the art pavement design techniques in an
ever changing dynamic loading environment on reclaimed
land for DP World.

Time savings…
The ability to work from the 3D model to maximise offsite
prefabrication for Melbourne Airport – T2 Bussing, Airline
Lounge & Transit Expansion (BALTE) enabling construction
around the clock on the airside of the international terminal
which remained operational.

Value adding. Time and cost
savings. Nothing is routine to us.

Port of Melbourne Projects

  • MacKenzie Road port entry/exit
  • New Coode Island Road
  • West Swanson Container Park Expansion
  • North Dynon Freight Terminal
  • 30 South Wharf
  • Sims Street Lowering
  • Appleton Dock Berth F
  • 25 South Wharf Roadworks
  • Kivelos Wharf
  • Crane Rail Replacement at East Swanson Dock

Melbourne Airport

  • AFP Headquarters
  • Qantas Club
  • Primary Data Centre & Building 219
  • D18 & D20 International Gates
  • Thunderstorm Warning System
  • T2 Screening Points & Retail Fitout
  • MLS & SPP Enabling Work
  • Tiger Terminal Relocation
  • T2 Airport Enhanced Coordination Centre
  • Border Force Control Room
  • T2 Bussing, Airline Lounge

Infrastructure Briefs
Preparation of Infrastructure Brief for Queensland Health for the new Sunshine Coast University Hospital and Private Hospital and Kawana Way Duplication. We have participated in the brief preparation and tender analysis for the New Royal Adelaide Hospital.