Client

Monash University

Sector

Higher Education

Location

Melbourne

Contract

Lump Sum Tender

Project Value

$100m

Year

2009

Monash University Science Technology Research and Innovation Precinct (Strip). Stages 2/3

JMP completed the design and contract administration of structural and civil works for the Monash STRIP 2/3.

This $100 million facility is on the University campus at Clayton. The all new three building complex houses 35,000sq m of substantial laboratories/ research and associated equipment areas, micro imaging, rodent housing and teaching facilities combined with office and other commercial spaces.

 The design includes:

  • Long span floors to provide clear open spaces and flexibility of layout to suit rapid changes in use for experimentation.
  • Vibration control set high as ASHRAE Curve F for laboratory areas.
  • Preformed penetrations through floors and beams for future vertical and horizontal services alterations.
  • PC2/3 laboratories where crack control is critical.
  • Active mass cooling in all floors.
  • Large internal service risers for many exhaust flue risers.

Innovations with this project included:

  • The building features an active mass cooling system via a pipe network cast in the structure. It has stringent vibration control to achieve ASHRAE F criteria. The design included precast and post tensioned concrete to achieve a very buildable solution and was delivered by traditional tender, under budget and on time, fully occupied March 2009. $10M saved from the Project budget.